A pilot improves performance on one production line. The results look promising. Leadership wants to expand.
Then the questions begin. Does the next plant capture the same information? Will its engineers trust the recommendations? How much of the first implementation can be reused?
Scaling AI in manufacturing requires trusted data, measurable operational value, and workflows that other plant teams can adopt. A successful pilot should demonstrate a production benefit while making the next deployment easier.
Start with a production problem worth solving
Manufacturers rarely lack ideas for AI. The harder task is choosing an opportunity that matters enough to pursue and is practical enough to deliver.
Start with a recurring production loss: extended stoppages, repeated defects, inconsistent throughput, or slow investigations. Define the result that needs to change and how improvement will be measured.
Four questions provide a useful decision framework:
- Value: Would solving this problem meaningfully improve performance or cost?
- Readiness: Is the necessary data available with enough operational context?
- Action: Who will use the output, and what can they do with it?
- Repeatability: Could the approach help other lines or plants?
For a quality investigation, that means giving engineers production history, evidence supporting a likely cause, and a corrective action they can evaluate.
Build for scaling, not just the first deployment
A narrowly configured pilot can deliver a local result yet leave the next site starting over. An ambitious infrastructure project can consume months before demonstrating a production benefit.
A practical approach solves a focused problem while building a trusted manufacturing data foundation. Connect relevant machine and system data, standardize definitions, and preserve relationships among equipment, products, materials, and production events. The intelligence layer can then use that context to investigate issues and guide action.
A 2026 smart manufacturing AI roadmap published by NIST identifies data management, system integration, and trustworthy operation as continuing challenges for industrial AI deployment.
Adoption belongs in the pilot’s evaluation, too. Can another engineer follow the investigation? Does someone own the response? Can the team verify whether the action helped?
A scalable pilot leaves behind a method that other teams can understand, apply, and improve.
Title: What makes an AI pilot ready to scale?
Description: Four connected requirements help manufacturers evaluate whether a successful pilot can deliver repeatable value across plants.
Lessons from HARMAN and FORVIA HELLA
These decisions were central to an 2026 Automotive News PACE Award finalists, featuring leaders from HARMAN and FORVIA HELLA. Both companies were 2026 Automotive News PACE Award finalists; HARMAN’s entry was a joint initiative with Arch Systems.
Focus the pilot on operational value
Barnes explained why HARMAN began with surface mount technology, or SMT, production: it offered opportunities to improve quality and productivity while reducing scrap.
HARMAN established its data foundation, then demonstrated value with a committed team at its Suzhou facility, which served as a model for broader deployment. Visible results generated interest from other plants.
Hoenecke emphasized the importance of clear objectives and dedicated ownership for FORVIA HELLA’s AI pilots:
“You have to have a complete focus and a clear target on what you want to achieve with a pilot.”
Involve plants in deciding what scales
Global standards and local innovation both matter. Barnes described the tension:
“If we try to deploy things from the top down, things take too long.”
HARMAN uses communities of practice to bring engineers and managers together across sites. They share lessons, compare solutions, and work with the global team to decide which approaches should expand.
The HARMAN PACE Award finalist case study details the broader initiative, including approximately 30% growth in total placements, a key measure of SMT throughput, and a 6 to 8 percentage-point improvement in overall equipment effectiveness, or OEE.
Prove value while preparing for expansion
Burke cautioned against building infrastructure for every possible application before getting the first one working. He also emphasized the need to support future applications:
“Let’s make sure we have the right infrastructure in place to make the next use case easier.”
The panel explores that balance through practical discussions of prioritization, workforce readiness, IT involvement, and sharing expertise across plants.
Watch the full panel discussion
What should manufacturers standardize? Which capabilities should they build earlier? How do they choose among dozens of AI opportunities?
Watch How Automotive Manufacturers Are Scaling the AI Use Cases That Work to hear HARMAN and FORVIA HELLA share their experiences and lessons learned.
Common questions
What makes a manufacturing AI pilot ready to scale?
A manufacturing AI pilot is ready to scale when it demonstrates measurable operational value, uses reliable data, has clear ownership, and provides a repeatable workflow.
Must every factory system be connected before starting an AI pilot?
Start with the data needed for a defined use case. Build a foundation that supports future applications, then expand as additional production needs justify it.
How can manufacturers balance global standards with local needs?
Standardize essential data definitions, performance measures, and proven workflows. Involve local engineers and production teams in selecting solutions and adapting implementation.